Image

BUILDING PERMITS | ||||||
The valuation to be used in computing the building permit and building plan review fees shall be the total value (rounded up to the nearest dollar) of all construction work for which a permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems, and any other permanent equipment. It shall also include the contractor’s profit which must not be omitted. The fees for each permit shall be, as set forth, in the tables below. Valuation shall be calculated using the City’s valuation tables, as required by the state of Oregon, multiplied by the square footage of the structure or as stated by the applicant, whichever is greater. |
||||||
Commercial Building Permit Valuation Table (per square foot) | ||||||
Total Value | Fee | |||||
$1 to $500 | $ | 13.00 | ||||
$501 to $2,000 | $ | 13.00 | for the first $500 + $1.95 for each additional $100 or fraction thereof, up to and including $2,000. | |||
$2001 to $25,000 | $ | 42.25 | For the first $2,000 + $7.80 for each additional $1,000 or fraction thereof, up to and including $25,000. | |||
$25,001 to $50,000 | $ | 221.65 | For the first $25,000 + $5.85 for each additional $1,000 or fraction thereof, up to and including $50,000. | |||
$50,001 to $100,000 | $ | 367.99 | For the first $50,000 + $3.90 for each additional $1,000 or fraction thereof, up to and including $100,000. | |||
$100,001 and up | $ | 562.90 | For the first $100,000 + $3.25 for each additional $1,000 or fraction thereof. | |||
Plan Review | % | 65 | of the permit fee | |||
Fire and Life Safety Plan Review Fee | % | 40 | of the permit fee | |||
Oregon surcharge | % | 12 | of the permit fee | |||
Seismic Fee | % | 1 | of the permit fee | |||
Residential Buildings | ||||||
New construction, finished basement and remodel | $ | 167.37 | ||||
Garages, accessory structures and pole buildings | $ | 66.48 | ||||
Carports, decks and patio/deck covers | $ | 33.24 | ||||
Unfinished basements | $ | 31.50 | ||||
Plan Review | % | 65 | of the permit fee | |||
Oregon surcharge | % | 12 | of the permit fee | |||
CAMP AND PARK PERMITS | ||||||
The fees for each permit issued for the construction, addition or alteration of a manufactured dwelling park, recreational vehicle park, or organizational camp developed shall be calculated using the valuation of the work and the Commercial Building Permit Valuation Table. | ||||||
ELECTRICAL PERMITS | ||||||
All electrical permits and inspections are administered by Oregon Building Codes Division out of their Pendleton Oregon office. | ||||||
FIRE SPRINKLER AND PROCESS PIPING PERMIT | ||||||
Permit fees are based on the value of the work performed and the value of all equipment, materials, labor, overhead and profit. | ||||||
Fire Sprinkler and Process Piping Permit Valuation Table | ||||||
Total Value | Fee | |||||
$1 to $1,000 | $ | 23.00 | ||||
$1,001 to $10,000 | $ | 23.00 | for the first $1000 plus $1.35 for each additional $100 or fraction thereof | |||
$10,001 to $100,000 | $ | 144.50 | for the first $10,000 plus $8.50 for each additional $1,000 or fraction thereof | |||
$100,001 and above | $ | 991.50 | for the first $100,000 plus $5.70 for each addition $1,000 or fraction thereof | |||
Permit issuance fee | $ | 20.00 | ||||
Minimum permit fee | $ | 45.00 | ||||
Plan review fee | % | 30 | of the permit fee | |||
Oregon surcharge | % | 12 | of the permit fee | |||
MANUFACTURED DWELLING PLACEMENT | ||||||
One single permit fee is assessed to cover the placement of the manufactured dwelling, strapping to the ground, plumbing connection including 30 feet each of sewer and water lines, electrical feeder connection and mechanical connection. This permit does not include an electrical service. | ||||||
Manufactured dwelling placement | $ | 211.00 | ||||
Re-Inspection | $ | 85.00 | ||||
State administrative fee (COMA) | $ | 30.00 | ||||
Oregon surcharge | % | 12 | of the permit fee | |||
MECHANICAL PERMITS | ||||||
The fees for each permit shall be as set in the following tables. The valuation used to determine the commercial mechanical permits shall include the value of all mechanical materials, equipment, labor and overhead. It shall also include the contractor’s profit which must not be omitted. | ||||||
Commercial Mechanical | ||||||
Total Value | Fee | |||||
$1 to $1,000 | $ | 23.00 | ||||
$1,001 to $10,000 | $ | 23.00 | For the first $1,000 + $1.35 for each additional $1,000 or fraction thereof, up to and including $10,000. | |||
$10001 to $100,000 | $ | 144.50 | For the first $10,000 + $8.50 for each additional $1,000 or fraction thereof, up to and including $100,000. | |||
$100,001 and up | $ | 991.50 | For the first $100,000 + $7.50 for each additional $1,000 or fraction thereof. | |||
Permit issuance fee | $ | 20.00 | ||||
Minimum permit fee | $ | 45.00 | ||||
Plan Review | % | 25 | of the permit fee | |||
Oregon surcharge | % | 12 | of the permit fee | |||
Residential & Manufactured Dwelling (per each appliance and/or equipment) | ||||||
Single duct exhaust fan | $ | 6.50 | i.e. bathroom, utility room, Log lighter (gas) | |||
A/C, heat pump, mini-split, unit heaters, fire/smoke damper, water heater (gas), wood/ pellet and/or gas stove, wood fireplace/insert, chimney liner, vent/flue for above items, range hood, clothes dryer, air handling less than 10,000 cfm | $ | 9.50 | ||||
Duct work | $ | 12.25 | ||||
Furnace ≤ 100,000 btu | $ | 13.25 | ||||
Furnace > 100,000 btu, air handling > 10,000 cfm | $ | 16.25 | ||||
Incinerator, chiller greater than 100,000 btu | $ | 24.25 | ||||
Gas/Fuel piping up to 4 outlets | $ | 20.00 | ||||
Gas/Fuel piping, additional | $ | 1.25 | each, after 4 outlets | |||
Permit issuance fee | $ | 20.00 | ||||
Minimum permit fee | $ | 45.00 | ||||
Oregon surcharge | % | 12 | of the permit fee | |||
Seismic Fee | % | 1 | of the permit fee | |||
PLUMBING PERMITS | ||||||
New 1&2 Family Dwelling | ||||||
One bathroom and one kitchen | $ | 210.00 | ||||
Two bathrooms and one kitchen | $ | 275.00 | ||||
Three bathrooms and one kitchen | $ | 325.00 | ||||
Each additional bathroom and/or kitchen | $ | 45.00 | ||||
Permit issuance fee | $ | 20.00 | ||||
Minimum permit fee | $ | 45.00 | ||||
Plan review fee (if needed) | % | 30 | of the permit fee | |||
Oregon surcharge | % | 12 | of the permit fee | |||
Commercial, Multi-Family and All Additions, Alterations and Repairs | ||||||
Clothes washer, dishwasher, drinking fountain, floor drain/sink/hub, ejectors/sump/expansion tank, hose bib, ice maker, grease interceptor, laundry tray, service sink, sink/basin/lavatory, tub/shower/pan, urinal, water closet, water heater, backflow preventer. | $ | 12.00 | ||||
Drain primer first five (each additional $2.00), catch basin/area drain, rain drain connector/downspout, garbage disposal, roof drain. | $ | 10.00 | ||||
Sanitary sewer, first 100' | $ | 30.00 | ||||
Sanitary sewer, each additional 100' | $ | 25.00 | ||||
Water service, first 100' | $ | 30.00 | ||||
Water service, each additional 100' | $ | 25.00 | ||||
Storm sewer, first 100' | $ | 30.00 | ||||
Storm sewer, each additional 100' | $ | 25.00 | ||||
Permit issuance fee | $ | 20.00 | ||||
Minimum permit fee | $ | 45.00 | ||||
Plan review fee (if needed) | % | 30 | of the permit fee | |||
Oregon surcharge | % | 12 | of the permit fee |