Columbia Avenue N.W. Improvements

Project Status
In Construction
Project ID
W 1.0, WW 1.0, ST 2.0
Project Type
Water/Wastewater/Street

100 Columbia Ave NW
Boardman, OR 97818
United States

Description

Project Description:
The City intends to replace the two parallel 8-inch concrete sewer lines along Columbia Avenue N.W. with one 15-inch polyvinyl chloride (PVC) sewer line. The project will include reinstating sewer service to residences, installing new manholes, and all work required to replace the sewer lines.

Project Justification:
In 2022, the City performed a closed-circuit television inspection of the sewer lines along this stretch of road. The inspection identified deficiencies, including root intrusions, pipe sags, and failed joints, and revealed that both sewer lines were reaching capacity during high demand periods. Replacing the existing concrete sewer lines with a single PVC line will ensure capacity requirements for the area are met. 

Status Updates

Construction begins April 23, 2024

Files & Resources

Map

View in Google Maps

45.842564424857, -119.7028657794

Timeline

2023-24 Fiscal Year

Budget

Proposed Budget:  $1,300,000

  • $400,000 Water Fund
  • $400,000 Wastewater Fund
  • $500,000 Street Fund

Adopted 2024 CIP